(image for) Midmark M11 AIR VENT BELLOWS ASSEMBLY DIAPHRAGM STYLE

Midmark M11 AIR VENT BELLOWS ASSEMBLY DIAPHRAGM STYLE

Model: RCB089-822

$179.97

Description

Midmark M11 High Quality Guaranteed Replacement Parts

Part #RCB089-822
Midmark Part #002-0375-00
Old Midmark Part #014-0193-00

AIR VENT BELLOWS ASSEMBLY (DIAPHRAGM STYLE)

  • ¼" Compression Fittings on Both Ends
  • Bronze Diaphragm Style
  • Stainless Steel Housing
  • Mounts to Tubing Between the Temperature Gauge and the Water Reservoir
  • Actuates within 12°F of Saturated Steam Temperature

Fits: Water Reservoir Tubing

Model This Part Fits: Midmark M11 Autoclaves (With Red LED Display Only)

AllClaveParts Now Offers Two Different Air Vent Bellows Assemblies: This One and the Longer Lasting Bellows Style Part #RCB100-823. Here is the difference:

The Bellows Style With It's Extra Convolutions, Is Designed To Last Longer Than The Diaphragm Style

 

This Diaphragm Bellows is the Same As What Midmark Originally Had Installed (They are both Diaphragm Style Assemblies). The Diaphragm Style Has Only One Convolution Doing All of the Work

The Other Style we Offer is the Bellows Style Assembly, our RCB100-823

This Bellows Style Assembly, Has Several Convolutions Instead of Just 1, So it Lasts Much Longer Than the Diaphragm Style.

Now You Can Also Upgrade Your Midmark M11 From The Air Vent Bellows Assembly To the Newest Style, Longest Lasting Steam Trap Assembly With This Easy To Install Steam Trap Upgrade Kit Part #MIK078-807

How To Replace The Midmark M11 Bellows Assembly


Remove The Old Midmark M11 Bellows Assembly

  1. Remove the Back Panel ( Click Here For Instructions)
  2. Disconnect Tube (1) From "Tee" (2)
  3. Pull Downward on the Bellows Assembly (3) to Remove The Old Bellows Assembly From The Condensing Tank (Water Reservoir) (4)
  4. Loosen and Remove Tubes (1 and 5) From Bellows Assembly (3)

 

 

Midmark M11 Bellows Assembly


Install The New Midmark M11 Bellows Assembly

Make Sure The Directional Arrow On The Bellows Is Pointing In The Direction Of The Water Reservoir (UP)

  1. Connect Tubes (1 and 5) to Bellows Assembly (3)
  2. Position the New Bellows Assembly (3) and Insert Tube (5) Into The Tube Hole of Condensing Tank (Water Reservoir) (4)
  3. Connect the Tube (1) to The "Tee" (2)
  4. Install Back Panel ( Click Here For Instructions)
Fast Delivery

We usually ship the same day! All packages are shipped w/Delivery Confirmation.

100% Secure Payment

Your transaction is secure thanks to the PayPal payment system: SSL (Secure Socket Layer).

Shopper Award
(image for) AllClaveParts Payment Methods
allclaveparts.com widget logo