After Sterilization is Complete, Packs Are Still Wet After Dry Mode
Verify support surface is level.
Verify water on all sides of chamber are equal
Adjust dry time.
Factory preset is 30 minutes
Clean / Replace filter.
Clean with Mid-Clean and brush
Test facility supply voltage. Voltage must be
115V models: 104 - 127 VAC 50/60 Hz
230V models: 207 - 253 VAC 50/60 Hz
Perform Heating Element Supply Voltage Test With harness attached to leads should have line voltage in test mode
Perform Main PC Board Relay Test Check TP1 and TP2 for an acceptable range: 10 to 14 VDC
Perform Main PC Board Pressure Transducer Voltage Test Acceptable range: 4.0 to 6.0 VDC
Replace Main PC board
Door is opened past the vented position