SECTION 4 - NORMAL CYCLE

TABLE 4-1
VALVE ACTUATION OPERATION MODE
CYCLE PROCESSFILL SOLENOIDBELLOWS SOLENOIDDUMP SOLENOID
FILLOPENOPENOPEN
STERILIZECLOSEDCLOSEDCLOSED
VENT (>40 kPa)CLOSEDOPENCLOSED
VENT (40-20 kPa)OPENCLOSEDCLOSED
DUMP
20 kPa
CLOSEDOPENOPEN
OFFCLOSEDOPENCLOSED


SECTION 4 - VALIDATOR PLUS NORMAL CYCLE


After loading the Validator Plus, close the door, select the proper mode and depress "CLEAR/START." The unit will display the selected mode parameter for four seconds, after which it will display "FILL" as water runs in from the water reservoir.

After filling, the display will show the current temperature and pressure. The heater will turn on and off to start chamber heating and pressure build-up. Pressure should begin to build at 90

There are no products to list in this category.

Categories

allclaveparts.com widget logo