QUICK & EASY WAY TO CHECK THE VALIDATOR TRIAC

Free Autoclave Troubleshooting Guides



How To Test The Validator Triac

Testing The Validator Triac is not difficult. Just follow the simple step-by-step directions below

  1. Turn the autoclave off & Disconnect the power
  2. Using an ohmmeter, attach the leads to GATE and MTI
  3. The ohmmeter should read approximately 65 Ω ohms
  4. Using the ohmmeter, attach the leads to GATE and MT2
  5. The ohmmeter should read a very high resistance in the megaohm region
  6. Using the ohmmeter attach the leads to MT1 and MT2
  7. The ohmmeter should read a very high resistance in the megaohm region. See diagram below

Validator 8 Triac Assembly Part #PCA084-396

Validator 10 Triac Assembly Part #PCA084-596

allclaveparts.com widget logo